About us:
Resurrection Ramp Crew was formed in 2000. We have 15 years of skateboard ramp construction under our belts, with 20 years of steel fabrication.
Resurrection Ramp Crew is available to build City parks, along with Private parks, or backyard ramps.
AUBURN CITY PARK- Built June 2002 for City of Auburn. We had the help from Auburn skaters and their parents on the design. Plenty of space to accomodate. Steel is the main surface on present ramps. Consists of: 4 & 5 foot 1/4 pipes, 5 foot slant bank, 2 1/2 mini pyramid, 3 foot flybox with rail, 4 foot pyramid with ledge (ledge is 12 inch and 24 inches), 1' box, 2' box, stair box, and uphill box, bank to wallride, launch ramps, and flat rail. Total start to finish project with design, meetings, and
building 2 years. Actual build time 1 month.
Norman LaFlash (508)832-4932
GRAFTON SKATEPARK. Park for Town of Grafton was completed May, 2001. Total addition to present design cost $4,000. Construction with 12 guage steel as top "skin". Total park project with last years designs $12,000. Contact Betty Wright (508) 839-5335 or (508)839-8507 extention #157.